|
|} Samsun Light Rail Transit System Project mainline route, ending in the station, starting station of the University. SHRs main line length of 15,695 meters, 1,900 meters of warehouse space and the interior of the shop building is 404 meters long. Approximately 14 kilometers off the line, 1.5 kilometers has also been designed as open line. ==Track== Home even in a total of 8 of providing the reversing switch and tram rails, there are 74 points. 2 types of rail used in the project. S49 ray fungus, also known as 13 492 meters of the rail line, known as Rİ60 grooved rail rail line is the 2203 meters. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Samsun Tram」の詳細全文を読む スポンサード リンク
|